Complete kitchen remodelling in Dubai Marina, Bay Central building for our client from UK. . Kitchen is very small and compact, we managed to organise it very well by relocating the washing machine into bathroom and dropping the wall.
Grey cabinets with light grey Corrian wall covers and worktop and sink from the same. Build in fridge.
Works: Kitchen wall dropped to gain more space to be able to fit an extra cabinet (cabinet with drawers is seen in the pictures next to hob); Ceiling organised, removed large nonsense spotlights; organised exhaust etc..; Exhaust range hood connected to exhaust system through the ceiling and pipe is inside the cabinets; The gap between wall cabinets and ceiling filled with the same colour and wood panel (customised by carpenter) to avoid the non use space on top of the cabinets which now looks great and tidy. 

Dubai kitchen remodelling Interior decor

kitchen remodelling Dubai interior decor

Dubai kitchen remodelling Interior decor